PROVENANCED POWER.

Power is knowledge lp

AI Fever in Power Stocks Moves From Nuclear to Plain Natural Gas
— Wall Street Journal
By 2030, data centers will require slightly more energy than Japan consumes today, with demand for AI-optimized facilities alone set to quadruple, IEA predicts
— Wall Street Journal
AI Boom Comes to Texas, Sparking Natural Gas Demand Surge
— East Daley Analytics

Building a giant in pecos, texas

A 3GW Behind-the-Meter Datacenter purpose built for AI in the most energy dense location in the entire world - the Permian Basin.

backed up by 228,000 acres of mineral rights

The Giant will be backed up by 228,000 acres of mineral rights with Multi-Trillion cubic feet Gas reserve potential bringing down fuel costs and creating redundancy in fuel supply.

5,000 well locations.

Strategically located between Energy Transfer’s Trans-Pecos Pipeline and Oasis-Pinon Pipelines with over 300 million Cubic feet of Gas per day to be delivered.

15,000 acres of surface rights adjoining mineral lease

15,000 acres of surface rights outside of any ETJ providing ample room for development and alternative energy development.

Texas’ first 765kv transmission line arriving to our doorstep

Texas House Bill 5066 mandated the build out of new Ultra High Voltage Transmission Lines throughout Texas. The Howard-Solstice project, scheduled to be online in 2030, will be Texas’ first 765kv line to be built in near proximity of site location.

Prolific water resources

Both ranches Sit atop one of the United States most prolific water aquifers - the El Capitan Reef complex.